City to reconstruct Oliver Street along campus

The city of Wichita has contracted with Kansas Paving to reconstruct Oliver Street between 17th and 19th Street starting this week. The work includes widening of Oliver to a five-lane roadway with two through lanes in each direction and a center two-way left-turn lane. A dedicated right turn lane also will be constructed for southbound Oliver onto 17th Street. The 17th and Oliver intersection will be reconstructed to include left-turn lanes in all directions, along with new traffic signals and brick crosswalks. A sidewalk will be constructed, including a 10-feet wide multi-use path on the west side of Oliver, north of 17th Street. The project should be completed by Aug. 15.